MCOR Preview Case Study – Rehabilitation of Deteriorated Power Plant Infrastructure

Address common power plant infrastructure deterioration using MCOR solutions. Replacement of severely deteriorated cooling water discharge pipes can be avoided by using MCOR 5105 | mCrete R Compound and MCOR 3880 | mClad xWear Alumina to rehabilitation. Applied by Engineered Lining Systems, this liner provided a “pipe within a pipe” and left this structure in “line new” condition. Detailed case study coming soon.